Electrical System Design and Installation of New Building, Aisyiyah University, Yogyakarta

Authors

  • Slamet Suripto Universitas Muhammadiyah Yogyakarta
  • Agus Jamal Universitas Muhammadiyah Yogyakarta
  • Kunnu Purwanto Universitas Muhammadiyah Yogyakarta
  • Wahyu Nugroho Wicaksono Universitas Muhammadiyah Yogyakarta
  • Yessi Jusman Universitas Muhammadiyah Yogyakarta

DOI:

https://doi.org/10.18196/jet.2337

Keywords:

Electrical Installation, Artificial Lighting, Short-circuit Current, Power Distribution, Drop Voltage

Abstract

Aisyiyah University New Yogyakarta Building is one of the commercial buildings that moves the field of education in Yogyakarta. The New Building of Aisyiyah University Yogyakarta consists of 10 floors, including the basement floor, main floor and roof floor. Electric loads installed at the New Building of Aisyiyah University Yogyakarta include lighting loads (lights) and power loads (sockets) and the power loads of electric motors (air conditioners, elevators and others), which of course requires a large enough electricity supply. Electricity installed in the New Building of Aisyiyah University in Yogyakarta is 1010.9 kVA. The power supplied is 800 kVA from State Electricity Company and the total power capacity of the transformer is 1000 kVA and a generator set with a capacity of 1000 kVA. Where the backup power supply system is fully supplied by the generator set.

References

Badan Standardisasi Nasional, Persyaratan Umum Instalasi Listrik 2000, vol. 2000, no. Puil. 2000.

Badan Standardisasi Nasional, Tata Cara Perancangan Sistem Pencahayaan Buatan pada Bangunan Gedung. 2001.

Hage, “Perbaikan Faktor Daya Menggunakan Kapasitor | Dunia Listrik,” 2008. [Online]. Available: http://dunia-listrik.blogspot.com/2008/12/perbaikan-faktor-daya-menggunakan.html. [Accessed: 08-May-2018].

International Electrotechnical Commission, “International Standard Short-circuit currents in three-phase a.c. systems,” in 61010-1 © Iec:2001, vol. 07, 2001, p. 13.

Badan Standardisasi Nasional, Tata Cara Perencanaan Proteksi Bangunan dan Peralatan terhadap Sambaran Petir. 2002.

Badan Standardisasi Nasional, Sistem Proteksi Petir pada Bangunan Gedung. 2004.

Downloads

Published

2020-01-06

How to Cite

Suripto, S., Jamal, A., Purwanto, K., Wicaksono, W. N., & Jusman, Y. (2020). Electrical System Design and Installation of New Building, Aisyiyah University, Yogyakarta. Journal of Electrical Technology UMY, 2(3), 82–88. https://doi.org/10.18196/jet.2337

Issue

Section

Articles