[1]
Syahputra, R., Nugroho, A.W., Chamim, A.N.N., Widyasmoro, W. and Prasetyo, T.I. 2018. Performance Analysis of Synchronous Generator: A Case Study in Steam Power Plant at PT POMI Paiton Unit 7 Probolinggo, East Java, Indonesia. Journal of Electrical Technology UMY. 2, 4 (Dec. 2018), 144–152. DOI:https://doi.org/10.18196/jet.2445.