[1]
M. Priyo and K. F. Indraga, “Analisis Kinerja Biaya Dan Jadwal Terpadu Dengan Konsep Earned Value Method (Studi Kasus: Proyek Pembangunan Gedung )”, st, vol. 18, no. 2, pp. 106–121, Aug. 2016.