1.
Priyo M, Indraga KF. Analisis Kinerja Biaya Dan Jadwal Terpadu Dengan Konsep Earned Value Method (Studi Kasus: Proyek Pembangunan Gedung ). st [Internet]. 2016Aug.11 [cited 2025Apr.30];18(2):106-21. Available from: https://journal.umy.ac.id/index.php/st/article/view/1812