Kajian Pola Operasi Jalur Ganda Kereta Api Muara Enim - Lahat

Dian Setiawan M

Abstract


Muara Enim – Lahat railway double track construction can optimise the passenger and freight transportation in South Sumatera. The objective of this study is to conduct railway double track operation concept analysis in order to obtain full concept of railway operation on this line. The result of this study become so important since it can be used for maintaining the optimisation steps of railway double track operation between Muara Enim – Lahat. This research was conducted by doing field survey and instantional survey to obtain primary and secondary data that is used as basic analysis of Muara Enim – Lahat railway track line operation. The key points included on this railway operation concept analysis are number of train per day, train length, maximum speed, station location, station function, station category, station type and activity, line capacity, and station layout. 


Keywords


Railway Double Track, Railway Operation, Railway Station, Line Capacity

Full Text:

PDF


DOI: https://doi.org/10.18196/st.v19i1.1832

Refbacks

  • There are currently no refbacks.


Copyright (c) 2016 Jurnal Semesta Teknika

Editorial Office :

SEMESTA TEKNIKA

Faculty of Engineering, Universitas Muhammadiyah Yogyakarta.

Jln. Brawijaya Tamantirto Kasihan Bantul 55183 Indonesia

Telp:(62)274-387656, Fax.:(62)274-387656

Email: semesta_teknika@umy.ac.id, semestateknika@umy.university

Website: http://http://journal.umy.ac.id/index.php/st

Creative Commons License

Semesta Teknika is licensed under a Creative Commons Attribution 4.0 International License.