Penerapan Metode “Earn Value” Dan “Project Crashing” Pada Proyek Konstruksi: Studi Kasus Pembangunan Gedung IGD RSUD Sunan Kalijaga, Demak
Abstract
Project of construction have unique characteristic. Process os construction will not continued by the other project. It caused by the condition that affect by the other project. The controlling of project is required to maintain compatibility between planning and actuating. Every activity that held in project must be do inspection and checking with spesification that used. The aim of the researchis determine the performance of project in terms of time and fixed cost. Beside that, This research intend to estimate time and cost for finishing project, and determining project performance index. Data that used for this is secondary data. Secondary data are obtained from contractor. There are budget plan, weekly report, progress report, and fixed cost of project. Research methode that used is Earned Value Methode. It could be analysis from schedulling, cost, and visualisation achievement jobs. From this methode is obtained estimation of cost and time to finishing project. This analysis is done by software Microsoft Excel.2010. Based on 19th week, The result show that have planned Value (PV) sebesar Rp.3.981.025.497,26, nilai Earned Value sebesar Rp. 4.835.552.298, dan nilai Actual Cost sebesar Rp.3.409.775.000,00. Based on Cost Varian sebesar Rp. 1.425.777.298,00 dan Cost Performance Index = 1,418 that the project have profit. From the schedulling project aspect is accelerating 5 week from the project schedule planning. It shows by the schedule varians Rp. 854..526.800,74 and schedule performance indeks = 1,215. Estimating cost to finishing project is Rp 4.950.908.465,70.
Keywords
Full Text:
PDFReferences
Agustianto, Fradina. 2015.Penerapan Earned Value Method (EVM) dan Crashing( Studi Kasus: Pembangunan Jl.Tol Cikampek-Palimanan Section VI-B STA 204+624 – 208+298). Tugas Akhir, Jurusan Teknik Sipil Universitas Muhammadiyah Yogyakarta, Yogyakarta.
Ervianto, W.I., 2004. Teori Aplikasi Manajemen Proyek Konstruksi. Penerbit : Andi, Yogyakarta.
Keputusan Menteri Tenaga Kerja dan Transmigrasi Republik Indonesia Nomor KEP.102/MEN/VI/2004 pasal 3, pasal 7 dan pasal 11.
Muhammad, Faris.F. 2015. Analisis Kinerja Biaya dan Jadwal Terpadu Dengan Menggunakan Konsep Metode Nilai Hasil ( Studi Kasus: Proyek Rekonstruksi dan Rehabilitasi Jembatan Desa Canggal-Candiroto). Tugas Akhir, Jurusan Teknik Sipil Universitas Muhammadiyah Yogyakarta, Yogyakarta.
Pujihastuti,S.Y. 2012.Aplikasi Nilai Hasil (EARNED VALUE METHOD) Pada Sistem Pengendalian Proyek Konstruksi.( Studi Kasus: Proyek Rekonstruksi / rehabilitasi Gedung Sekolah Sd Negeri Gunung Mulyo Bantul. Tugas Akhir, Jurusan Teknik Sipil Universitas Muhammadiyah Yogyakarta, Yogyakarta.
Ramadhan, M.N.S. 2015.Penerapan Earned Value Method (EVM) dan Crashing( Studi Kasus: Pembangunan Jl.Tol Cikampek-Palimanan Section VI-B STA 200+950-204+624). Tugas Akhir, Jurusan Teknik Sipil Universitas Muhammadiyah Yogyakarta, Yogyakarta.
Soeharto, Imam, 1997. Manajemen Proyek Dari Konseptual Sampai Operasional, Erlangga, Jakarta.
Soeharto, Iman. 1995.Manajemen Proyek.Penerbit :Erlangga, Jakarta.
DOI: https://doi.org/10.18196/st.v20i1.2434
Refbacks
- There are currently no refbacks.
Copyright (c) 2017 Jurnal Semesta Teknika
Editorial Office :
SEMESTA TEKNIKA
Faculty of Engineering, Universitas Muhammadiyah Yogyakarta.
Jln. Brawijaya Tamantirto Kasihan Bantul 55183 Indonesia
Telp:(62)274-387656, Fax.:(62)274-387656
Email: semesta_teknika@umy.ac.id, semestateknika@umy.university
Website: http://http://journal.umy.ac.id/index.php/st
Semesta Teknika is licensed under a Creative Commons Attribution 4.0 International License.