Studi Optimasi Waktu dan Biaya dengan Metode Time Cost Trade Off pada Proyek Konstruksi Pembangunan Gedung Olah Raga (Gor)

Mandiyo Priyo, Meiki Risa Anggriani Paridi

Abstract


Cost and time analysis are most important on the contruction project. Optimal Time and minimal cost become standart to make profit benchmarks on a project. Therefore, it is necessary to optimize the cost and time by looking for work items that are included in the critical path. The purpose of this study is to know the change of cost and time due to the addition of working time, change of cost and time due to the addition of employee, as well as cost that needed if the projects experienced delays and penalty.. So it will be compared from all three to get the minimum cost with the optimum duration.The data used in this study is secondary data obtained from contractor implementing. Data analysis using time cost trade off method with microsoft project 2010 program. The results of the study, From the time cost trade off with the addition of 1 hours of work per day conducted on first day on critical jobs during the project, obtained the reduction in the cost of Rp 39,552,394,71 and the reduction in the duration of 36.18 days. Addition of 2 hours of work per day obtained the reduction in the cost of Rp 57,532,834.66 and and the reduction in the duration of 62.61 days. Addition of 3 hours of work per day obtained the reduction in the cost of Rp 69,392,147,01 and and the reduction in the duration of 82.48 days. Meanwhile, for the addition of employee for 1 hours obtained the reduction in the cost of Rp 52.497.085,35 and the reduction in the duration of 36.18 days. Addition of employee for 2 hours obtained the reduction in the cost of Rp 91,349,394.80 and the reduction in the duration of 62.61 days. Addition of employee for 3 hours obtained the reduction in the cost of Rp 120,645,301,55 and the reduction in the duration of 82,48 days. So that, the optimal time and cost occur when addition employee is incurred for 3 hours, compared to overtime and overdue. Namely with the optimal cost of the project of Rp 2,418,408,305.45 and the optimal duration of the project for 57.52 days.


Keywords


Microsoft Project 2010, Time Cost Trade Off, Cost, Time

Full Text:

PDF

References


Dwijono, D., 2017, Optimalisasi Waktu Percepatan dan Biaya Kegiatan di dalam Metode Jalur Kritis dengan Pemrograman Linier, Jurnal Terapan Teknologi Informatika, 1(1), pp. 1-9.

Dipohusodo, I., 1996, Manajemen Proyek Dan Konstruksi, Yogyakarta: Kanisius.

Frederika, A., 2010, Analisis Percepatan Pelaksanaan dengan Menambah Jam Kerja Optimum pada Proyek Konstruksi (Studi Kasus Proyek Pembangunan Super Villa Peti Tenget-Badung, Jurnal

Ilmiah Teknik Sipil, 14(2), pp. 113-126.

Ikhtisholiyah, 2017, Analisis Penerapan Manajemen Waktu dan Biaya pada Proyek Pembangunan Gedung Kuliah Teknik Listrik Industri Politeknik Negeri Madura (POLTERA), Zeta - Math Journal, 3(1), pp. 14-21.

Kareth, M., 2012, Analisis Optimalisasi Waktu dan Biaya Dengan Program Primavera 6.0 (Studi Kasus Proyek Pembangunan Puri Kelapa Gading), Jurnal Sipil Statik, 1(1), pp. 53-59.

Khodijah, N.S., Yahdin, S., Dewi, N.R., 2013, Optimalisasi Pelaksanaan Proyek Pembangunan Persinyalan Elektrik di Stasiun Kertapati dengan Penerapan Metode Crash Program, Jurnal Penelitian Sains, 16(2A), pp. 65-74.

Pawiro, D.A., Suharyanto, Atmojo, P.S., 2014, Optimalisasi Biaya dan Waktu dalam Penyusunan Jadwal Pelaksanaan Proyek (Studi Kasus Proyek Pembangunan Gedung Pusat Kegiatan Mahasiswa Universitas Diponegoro Semarang,. Jurnal Media Komunikasi Teknik Sipil, 20(2), pp. 103-108.

Priyo, M., Sumanto, A., 2016, Analisis Percepatan Waktu dan Biaya Proyek Konstruksi dengan Penambahan Jam Kerja (Lembur) Menggunakan Metode Time Cost Trade Off (Studi Kasus Pembangunan Prasarana Pengendalian Banjir), Jurnal Ilmiah Semesta Teknika, 19(1), pp. 1-15.

Simatupang, J.S., 2015, Pengaruh Percepatan Durasi Terhadap Waktu Pada Proyek Konstruksi (Studi Kasus Pembangunan Persekolahan Eben Haezar Manado), Jurnal Sipil Statik, 3(5), pp. 281-291.

Soeharto, I., 1995, Manajemen Proyek Dari Konseptual Sampai Operasional, Jakarta: Erlangga.

Telaumbanua, T.A., 2017, Perencanaan Waktu Penyelesaian Proyek Toko Modisland Manado dengan Metode CPM, Jurnal Sipil Statik, 5(8), pp. 549-557.

Wowor, F., 2013, Aplikasi Microsoft Project dalam Pengendalian Waktu Pelaksanaan Pekerjaan Proyek, Jurnal Sipil Statik, 1(8), pp. 543-548.




DOI: https://doi.org/10.18196/st.211213

Refbacks

  • There are currently no refbacks.


Copyright (c) 2018 Semesta Teknika

Editorial Office :

SEMESTA TEKNIKA

Faculty of Engineering, Universitas Muhammadiyah Yogyakarta.

Jln. Brawijaya Tamantirto Kasihan Bantul 55183 Indonesia

Telp:(62)274-387656, Fax.:(62)274-387656

Email: semesta_teknika@umy.ac.id, semestateknika@umy.university

Website: http://http://journal.umy.ac.id/index.php/st

Creative Commons License

Semesta Teknika is licensed under a Creative Commons Attribution 4.0 International License.